Red Lake Airport Zoning Regulations (SOR/94-556)

Regulations are current to 2024-10-30

Red Lake Airport Zoning Regulations

SOR/94-556

AERONAUTICS ACT

Registration 1994-08-16

Regulations Respecting Zoning at Red Lake Airport

P.C. 1994-1357 1994-08-16

Whereas, pursuant to section 5.5 of the Aeronautics Act, a copy of the proposed Regulations respecting zoning at Red Lake Airport, substantially in the form set out in the schedule hereto, was published in two successive issues of the Canada Gazette Part I, on May 14th and 21st, 1994, and in two successive issues of the Red Lake Sunset County Times on May 31st and June 7th, 1994, and a reasonable opportunity was thereby afforded to interested persons to make representations to the Minister of Transport with respect thereto;

Therefore, His Excellency the Governor General in Council, on the recommendation of the Minister of Transport, pursuant to section 5.4 of the Aeronautics Act, is pleased hereby to make the annexed Regulations respecting zoning at Red Lake Airport.

Short Title

 These Regulations may be cited as the Red Lake Airport Zoning Regulations.

Interpretation

  •  (1) In these Regulations,

    airport

    airport means the Red Lake Airport, in the Township of Dome, in the Province of Ontario; (aéroport)

    airport reference point

    airport reference point means the point described in Part I of the schedule; (point de repère de l’aéroport)

    approach surfaces

    approach surfaces means the imaginary inclined planes that extend upward and outward from each end of a strip, which planes are more particularly described in Part II of the schedule; (surfaces d’approche)

    outer surface

    outer surface means an imaginary plane located above and in the immediate vicinity of the airport, which plane is more particularly described in Part III of the schedule; (surface extérieure)

    strip

    strip means the rectangular portion of the landing area of the airport, including the runway, prepared for the take-off and landing of aircraft in a particular direction, which portion is more particularly described in Part IV of the schedule; (bande)

    transitional surfaces

    transitional surfaces means the imaginary inclined planes that extend upward and outward from the lateral limits of a strip and its approach surfaces, which planes are more particularly described in Part V of the schedule. (surfaces de transition)

  • (2) For the purposes of these Regulations, the elevation of the airport reference point is 376.5 m above sea level.

Application

 These Regulations apply to all land, including public road allowances, that is adjacent to or in the vicinity of the airport, which land is more particularly described in Part VI of the schedule.

General

 No person shall erect or construct, on any land to which these Regulations apply, any building, structure or object or any addition to any existing building, structure or object, the highest point of which will exceed in elevation at the location of that point

  • (a) the approach surfaces;

  • (b) the outer surface; or

  • (c) the transitional surfaces.

Aeronautical Facilities

 No owner or lessee of any land to which these Regulations apply shall permit any part of that land to be used or developed in a manner that causes interference with any signals or communications to and from any aircraft or to and from any facilities used to provide services relating to aeronautics.

Natural Growth

 Where an object of natural growth that is on any land to which these Regulations apply grows to a height that exceeds in elevation at the location of the object any of the surfaces referred to in section 4, the Minister may require that the owner or lessee of the land remove the excessive growth.

Disposal of Waste

 No owner or lessee of any land to which these Regulations apply shall permit any part of that land to be used for the disposal of any waste that is edible by or attractive to birds.

SCHEDULE(Sections 2 and 3)

PART IDescription of the Airport Reference Point

The airport reference point, shown on Red Lake Airport Zoning Plan No. 60-041 86-112, Sheet 5, dated September 28, 1988, is a point which may be located by:

COMMENCING at the threshold of runway 08 at a point of the centre line of the said runway having Universal Transverse Mercator coordinates in Zone 15 with Central Meridian 93° West of 5 657 226.90 N and 443 701.00 E;

THENCE easterly along the centre line of the said runway, 610 m to a point;

THENCE northerly, perpendicular to the said runway centre line, 45 m to the airport reference point having Universal Transverse Mercator coordinates of 5 657 375.56 N and 444 294.05 E.

PART IIDescription of the Approach Surfaces

The approach surfaces, shown on Red Lake Airport Zoning Plan No. 60-041 86-112, Sheets 4, 5 and 6, dated September 28, 1988, are planes abutting each end of the strip associated with runway designated 08-26 and are described as follows:

  • (a) an inclined plane abutting the end of the strip associated with the approach to runway 08 having a ratio of 1 m measured vertically to 40 m measured horizontally rising to an imaginary horizontal line drawn at right angles to the projected centre line of the strip and distant 1 792 m measured horizontally from the end of the strip; the outer ends of the imaginary horizontal line being 343.8 m from the projected centre line; said imaginary horizontal line being 44.8 m above the elevation at the end of the strip; and

  • (b) an inclined plane abutting the end of the strip associated with the approach to runway 26 having a ratio of 1 m measured vertically to 40 m measured horizontally rising to an imaginary horizontal line drawn at right angles to the projected centre line of the strip and distant 1 536 m measured horizontally from the end of the strip; the outer ends of the imaginary horizontal line being 305.4 m from the projected centre line; said imaginary horizontal line being 38.4 m above the elevation at the end of the strip.

PART IIIDescription of the Outer Surface

The outer surface, shown on Red Lake Airport Zoning Plan No. 60-041 86-112, Sheets 1 to 9 inclusive, dated September 28, 1988, is an imaginary plane established at a constant elevation of 45 m above the elevation of the airport reference point, except that, where that plane is less than 9 m above the surface of the ground, the outer surface is located at 9 m above the surface of the ground.

PART IVDescription of the Strip

The strip associated with runway 08-26, shown on Red Lake Airport Zoning Plan No. 60-041 86-112, Sheet 5, dated September 28, 1988 is 150 m in width, 75 m being on each side of the centre line of the runway, and 1 644.28 m in length.

PART VDescription of the Transitional Surface

Each transitional surface, shown on Red Lake Airport Zoning Plan No. 60-041 86-112, Sheets 4, 5 and 6, dated September 28, 1988, is an inclined plane rising at a ratio of 1 m measured vertically to 7 m measured horizontally at right angles to the centre line and projected centre line of the strip, extending upward and outward from the lateral limits of the strip and its approach surfaces to an intersection with the outer surface.

PART VIDescription of the Lands to Which These Regulations Apply

The outer boundary of the land to which these Regulations apply, shown on Red Lake Airport Zoning Plan No. 60-041 86-112, Sheets 1 to 9 inclusive, dated September 28, 1988, is described as follows:

COMMENCING at the boundary between the Townships of Balmer and Dome where it is intersected by the northern limit of Mining Claim KRL1016;

THENCE easterly from the boundary between the Townships of Balmer and Dome along the northern boundary of Mining Claims KRL1016 and KRL998 (now recorded as Mining Claim KRL17797) to the northeast corner of said Mining Claim KRL998 (now recorded as Mining Claim KRL17797);

THENCE southerly along the eastern boundary of Mining Claim KRL998 (now recorded as Mining Claim KRL17797) to the northern boundary of Mining Claim KRL1010 (now recorded as Mining Claims KRL19209 and KRL19210);

THENCE easterly along the northern boundary of Mining Claim KRL1010 (now recorded as Mining Claim KRL19210) to the northeast corner of said Mining Claim KRL1010 (now recorded as Mining Claim KRL19210);

THENCE southerly along the eastern boundary of Mining Claim KRL1010 (now recorded as Mining Claim KRL19210) to the northern boundary of Mining Claim KRL19667;

THENCE easterly along the northern boundary of Mining Claim KRL19667 to the northeast corner of said Mining Claim KRL19667;

THENCE southerly along the eastern boundary of Mining Claims KRL19667 and KRL19668 and part of Mining Claim KRL20831 to the northern boundary of Mining Claim KRL20830;

THENCE easterly along the northern boundary of Mining Claim KRL20830 to the northeast corner of said Mining Claim KRL20830;

THENCE southerly along the eastern boundary of Mining Claim KRL20830 to the northern boundary of Mining Claim KRL20755;

THENCE easterly along the northern boundary of Mining Claim KRL20755 to the northeast corner of said Mining Claim KRL20755;

THENCE southerly along the eastern boundaries of Mining Claims KRL20755, KRL19670 and KRL1967l to the southeastern corner of Mining Claim KRL19671;

THENCE westerly along the southern boundaries of Mining Claims KRL19671 and KRL20070 to the southwestern corner of the said Mining Claim KRL20070;

THENCE southerly along the eastern boundaries of Mining Claims KRL20252, KRL20255 and KRL20840 to its intersection with the western boundary of a plan of subdivision registered in the Registry Office for the Land Titles Division of Kenora (No. 23) as Plan Number M-304;

THENCE southerly and easterly along the western and southern boundaries of Plan M-304 to the intersection with the northern boundary of Mining Claim KRL118 (now recorded as Mining Claim KRL19502);

THENCE southerly along the western boundary of Mining Claim KRL118 (now recorded as Mining Claim KRL19502), to its intersection with the eastern limit of Highway 125;

THENCE southwesterly along the eastern limit of the said Highway 125 to its intersection with the eastern boundary of Mining Claim KRL8542 (now recorded as Mining Claim KRL20837);

THENCE southerly along the eastern boundary of Mining Claim KRL8542 (now recorded as Mining Claim KRL20837) to the southeast corner of said Mining Claim KRL20837;

THENCE westerly along the southern boundary of Mining Claim KRL8542 (now recorded as Mining Claim KRL20837) to the western boundary of the Township of Balmer;

THENCE southerly along the boundary between the Townships of Balmer and Dome to the southeast corner of Mining Claim KRL8541 (now recorded as Mining Claim KRL20838);

THENCE westerly along the southern boundary of Mining Claim KRL8541 (now recorded as Mining Claim KRL20838) to where it meets the eastern boundary of Mining Claim K1582;

THENCE northerly along the eastern boundary of Mining Claim K1582 to the northeast corner of Mining Claim K1582;

THENCE westerly along the northern boundary of Mining Claim K1582 to the northwest corner of Mining Claim K1582 as shown on a plan of subdivision registered in the Registry Office for the Land Titles Division of Kenora (No. 23) as Plan Number M-787 and being a point in the limit of the said Plan Number M-787;

THENCE northerly along that part of the northeast limit of Plan Number M-787, also being part of the western boundary of Mining Claim K1481 to its intersection with the inner limit of the original 20.117 metre reserve around Red Lake;

THENCE northwesterly, westerly, southwesterly and southeasterly along the limit of the said Plan Number M-787 and always perpendicular to and distant 20.117 metres from the high water mark of Red Lake to its intersection with the eastern limit of Mining Claim K1597;

THENCE southerly along the eastern boundary of Mining Claim K1597 to the southeast corner of said Mining Claim K1597;

THENCE westerly along the southern boundaries of Mining Claims K1597 and KRL19944 to the eastern boundary of Mining Claim K1167;

THENCE southerly along the eastern boundary of Mining Claim K1167 to the southeast corner of said Mining Claim K1167;

THENCE westerly along the southern boundary of Mining Claim K1167 to the southwest corner of said Mining Claim K1167;

THENCE southerly along the eastern boundary of Mining Claim KRL20015 to the southeast corner of said Mining Claim KRL20015;

THENCE westerly along the southern boundary of Mining Claim KRL20015 to the eastern boundary of Mining Claim K1532 (now recorded as Mining Claim KRL28939);

THENCE northerly along the eastern boundary of Mining Claim K1532 (now recorded as Mining Claim KRL28939) to the northeast corner of said Mining Claim K1532 (now recorded as Mining Claim KRL28939);

THENCE westerly along the northern boundary of Mining Claim K1532 (now recorded as Mining Claim KRL28939) to the northwest corner of Mining Claim K1532 (now recorded as Mining Claim KRL28939);

THENCE westerly along the southern boundaries of Mining Claims KRL12672 and KRL12671 to the southwest corner of said Mining Claim KRL12671;

THENCE northerly along the western boundary of Mining Claim KRL12671 to the eastern boundary of Mining Claim KRL11325;

THENCE southwesterly and southerly along the eastern boundaries of Mining Claims KRL11325 and KRL12670 to the southeast corner of Mining Claim KRL12670;

THENCE westerly along the southern boundary of Mining Claim KRL12670 to the southwest corner of said Mining Claim KRL12670;

THENCE northerly along the western boundary of Mining Claim KRL12670 to the northeast corner of Mining Claim KRL6005;

THENCE westerly along the southern boundary of Mining Claim KRL12849 to the southwest corner of said Mining Claim KRL12849;

THENCE westerly along the northern boundaries of Mining Claims KRL5944 and KRL5945 to its intersection with the eastern boundary of Mining Claim KRL5946;

THENCE northerly along the eastern boundary of Mining Claim KRL5946 to the northeast corner of Mining Claim KRL5946;

THENCE westerly along the northern boundary of Mining Claim KRL5946 to its intersection with the eastern boundary of Mining Claim KRL42069 (now recorded as Mining Claim KRL869570);

THENCE northerly along the eastern boundaries of Mining Claims KRL42069 (now recorded as part of Mining Claim KRL869570), KRL42063 (now recorded as part of Mining Claim KRL869565) and KRL42062 (now recorded as Mining Claim KRL869556) to its intersection with the southern boundary of Mining Claim KRL11528;

THENCE westerly along the southern boundary of Mining Claim KRL11528 to the southwest corner of said Mining Claim KRL11528;

THENCE northerly and northwesterly along the western boundaries of Mining Claims KRL11528 and KRL11372 (now recorded as Mining Claim KRL13318) to the most southerly corner of Mining Claim KRL869652;

THENCE westerly along the southern boundary of Mining Claim KRL869652 to the southwest corner of the said Mining Claim KRL869652;

THENCE northerly along the western boundaries of Mining Claims KRL869652, KRL869653, KRL10643, KRL10923, KRL12307 and KRL915 to the northwest corner of said Mining Claim KRL915;

THENCE easterly along the northern boundary of Mining Claim KRL915 to the southeast corner of Mining Claim KRL12181 being also the southwest corner of Mining Claim KRL12180;

THENCE northerly along the western boundary of Mining Claim KRL12180 to the northwest corner of said Mining Claim KRL12180;

THENCE easterly along the northern boundary of Mining Claim KRL12180 to the western boundary of Mining Claim KRL10651;

THENCE northerly along the western boundaries of Mining Claims KRL10651 and KRL10668 to the northwest corner of said Mining Claim KRL10668;

THENCE easterly along the northern boundary of Mining Claim KRL10668 to the western boundary of Mining Claim K1619 (now recorded as Mining Claim KRL10334);

THENCE northerly along the western boundaries of Mining Claims K1619 (now recorded as Mining Claim KRL10334) and KRL10667 to the northwest corner of said Mining Claim KRL10667;

THENCE easterly along the northern boundary of Mining Claim KRL10667 to the southeast corner of Mining Claim KRL12176;

THENCE northerly along the eastern boundary of Mining Claim KRL12176 to the northwest corner of Mining Claim KRL10904;

THENCE easterly along the northern boundaries of Mining Claims KRL10904 and KRL10913 (now recorded as Mining Claim KRL503013) to the northeast corner of said Mining Claim KRL10913 (now recorded as Mining Claim KRL503013);

THENCE northerly along the western boundary of Mining Claim KRL10912 to the northwest corner of said Mining Claim KRL10912;

THENCE easterly along the northern boundaries of Mining Claims KRL10912 and KRL10914 and part of the southern boundary of Mining Claim KRL18247 to the southeast corner of Mining Claim KRL18247;

THENCE northerly along the eastern boundary of Mining Claim KRL18247 being the westerly boundary of Mining Claim KRL10733 to the northwest corner of said Mining Claim KRL10733;

THENCE easterly along the southern boundary of Mining Claim KRL18249 to the southeast corner of said Mining Claim KRL18249;

THENCE southerly along the western boundary of Mining Claim KRL1640 to the southwest corner of said Mining Claim KRL1640;

THENCE easterly along the northern boundaries of Mining Claims KRL10733, KRL312, K1515, KRL313 and KRL315 to the northeast corner of said Mining Claim KRL315;

THENCE southerly along the eastern boundary of Mining Claim KRL315 to the southeast corner of said Mining Claim KRL315;

THENCE easterly along the northern boundary of Mining Claim KRL1012 to the northeast corner of Mining Claim KRL1012;

THENCE southerly along the eastern boundary of Mining Claim KRL1012 to the southwest corner of Mining Claim KRL17792;

THENCE westerly along the northern boundary of Mining Claim KRL1011 to the northwest corner of said Mining Claim KRL1011;

THENCE southerly along the eastern boundary of Mining Claim KRL1012 to the southeast corner of said Mining Claim KRL1012;

THENCE easterly along the northern boundary of Mining Claim KRL1016 to its intersection with the boundary between the Townships of Dome and Balmer, being the Point of Commencement.