Wastewater Systems Effluent Regulations
Version of section 33 from 2015-01-01 to 2024-05-26:
Marginal note:Early expiry
33 Despite subsections 24(2) and 26(2), a transitional authorization expires at the end of a given calendar year, quarter or month determined in accordance with subsection 6(2), if the effluent deposited via the final discharge point of the wastewater system was not acutely lethal and met the conditions for the authorization set out in paragraphs 6(1)(a) and (b) during
(a) that given calendar year;
(b) that given quarter and the three quarters immediately before that given quarter during which effluent was deposited via the final discharge point; or
(c) that given month and each of the 11 months immediately before that given month during which effluent was deposited via the final discharge point.
- Date modified: