Railway Interswitching Regulations
Version of the schedule from 2017-08-01 to 2019-06-24:
SCHEDULE(Sections 8 to 10)
Interswitching Rates
Item | Column I | Column II | Column III | Column IV | Column V |
---|---|---|---|---|---|
Interswitching distance zone | Rate per car for interswitching traffic to or from a siding ($) | Rate per car for interswitching a car block ($) | Additional rate per kilometre for interswitching a car ($) | Additional rate per kilometre for interswitching a car in a car block ($) | |
1 | Zone 1 | 229 | 46 | N/A | N/A |
2 | Zone 2 | 248 | 55 | N/A | N/A |
3 | Zone 3 | 284 | 65 | N/A | N/A |
4 | Zone 4 | 251 | 74 | 3.38 | 1.20 |
5 | [Repealed, SOR/2014-193, s. 4] |
- SOR/89-113, s. 1
- SOR/90-36, s. 1
- SOR/91-12, s. 2
- SOR/92-39, s. 1
- SOR/92-738, s. 1
- SOR/93-614, s. 1
- SOR/94-786, s. 1
- SOR/95-596, s. 1
- SOR/97-84, s. 1
- SOR/97-519, s. 2
- SOR/2004-201, s. 1
- SOR/2013-28, s. 1
- SOR/2013-207, s. 1
- SOR/2014-193, s. 4
- Date modified: