Government of Canada / Gouvernement du Canada
Symbol of the Government of Canada

Search

Electricity and Gas Inspection Regulations

Version of section 3 from 2007-05-03 to 2009-02-25:

  •  (1) Instrument transformers that are designed and constructed to have fixed, non-adjustable accuracy characteristics are exempted from subsection 9(1) of the Act.

  • (2) A diaphragm gas meter with a broken seal is exempt from the requirement of subsection 15(2) of the Act that it not be continued in use until it has been reverified if all of the following conditions are satisfied:

    • (a) the seal was deliberately broken by an inspector or accredited meter verifier for the purpose of installing a device that transmits the reading of the meter to a remote location;

    • (b) no components of the meter other than the register cover and the register have been removed from the meter;

    • (c) any component that has been removed from the meter has been promptly replaced such that the reading of the register is unchanged except for, in cases where the register has not been removed, increases indicating the volume of gas that passed through the meter during the time the seal was broken; and

    • (d) the meter is promptly resealed and restamped, relabelled, retagged or otherwise marked by an inspector or accredited meter verifier in accordance with the specifications made available by the director pursuant to section 18 of these Regulations.

  • (3) A meter that was originally sealed using a plastic filament of any diameter or a metallic filament with a diameter of less than 0.644 mm and that is discovered in service with a broken seal is exempt from the requirement of subsection 15(2) of the Act that it not be continued in use until it has been reverified if both of the following conditions are satisfied:

    • (a) there is no visible sign that the broken seal resulted from an attempt to alter or affect the working parts or adjustments of the meter or in any other way affect the registration of the meter; and

    • (b) the meter is resealed by an inspector in accordance with the Act and these Regulations.

  • SOR/92-438, s. 2
  • SOR/2007-89, s. 1

Date modified: