Nunavut Mining Regulations
Version of section 80 from 2014-03-28 to 2017-06-18:
Marginal note:Extension on account of strike
80 If, as a result of a strike within the meaning of subsection 2(1) of the Public Service Labour Relations Act, a holder of a prospecting permit, recorded claim or lease is unable, through no fault on their part, to do a thing within the time required by these Regulations, the deadline for doing that thing is extended for a period ending 15 days after the last day of the strike.
- Date modified: