Government of Canada / Gouvernement du Canada
Symbol of the Government of Canada

Search

Explosives Regulations, 2013

Version of section 49 from 2016-04-15 to 2018-11-01:


Marginal note:Information on packaging

  •  (1) A holder of an export permit must ensure that the following information is legibly printed on the packaging, or on a label affixed to the packaging, of each Footnote *explosive to be exported:

    • (a) the words “Ammunition/Munitions”, “Explosives/Explosifs”, “Fireworks/Pièces pyrotechniques”, “Pyrotechnics/Pièces pyrotechniques” or “Rocket Motors/Moteurs de fusée”, as the case may be, on the outer packaging and any inner packaging;

    • (b) the Footnote *product name of the explosive and the name and address of the person who obtained its authorization, on the outer packaging;

  • Marginal note:Report

    (2) A holder of an export permit must complete, sign and send to the Chief Inspector of Explosives a report using the form provided by the Department of Natural Resources. The report must include the following information:

    • (a) the holder’s name, address, telephone number, fax number and email address;

    • (b) the holder’s permit number and its expiry date;

    • (c) the Footnote *product name and UN number of each explosive that was exported and the name of the person who obtained its authorization;

    • (d) the quantity and UN number of each type of explosive that was exported;

    • (e) the country of origin of each explosive;

    • (f) the means of transport used;

    • (g) the location of the Canadian port of exit through which each explosive passed; and

    • (h) the date of the report and the name of the person who completed the report.

  • Marginal note:Deadline — annual permit

    (3) A holder of an annual permit must submit the report before the permit is renewed or, if the permit is not renewed, within a year after it expires. The report must be submitted even if no explosives were exported during the year for which the permit was valid.

  • Marginal note:Deadline — single use permit

    (4) A holder of a single use permit must submit the report within 30 days after the date on which the explosives were exported.

  • Marginal note:Exception

    (5) Subsections (2) to (4) do not apply to a holder that reports the importation of explosives by electronic means in accordance with section 4 of the Reporting of Imported Goods Regulations.

  • SOR/2016-75, ss. 9, 39

Date modified: