  •  (1) The owner or operator of a mine shall record without delay in cubic metres the total monthly volume of effluent deposited from each final discharge point.

  • (2) The total monthly effluent volume deposited from each final discharge point shall be based on the average of the flow rates that are measured in accordance with subsection (3).

  • (3) The owner or operator shall

    • (a) measure flow rates at the same time as samples are collected under section 12, unless the owner or operator uses a system that takes continuous measurements;

    • (b) use monitoring equipment that is accurate to within 15% of measured flow; and

    • (c) calibrate the monitoring equipment not less than once in each year and record the results.