CANADA OIL AND GAS OPERATIONS ACTCanada Oil and Gas Drilling RegulationsRegulations Respecting the Exploration and Drilling for and the Conservation of Oil and Gas and the Measures to Ensure the Safety of such Operations[Repealed, SOR/2009-315, s. 103]Short Title[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Interpretation[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Application[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Submission of Information[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]General[Repealed, SOR/2009-315, s. 103]Application for Authorization[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Conditions of Drilling Program Authorization[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/96-116, s. 3]Defective or Experimental Equipment[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/96-116, s. 5]Support Craft[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Standby Craft[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/96-116, s. 7]Hazards[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Requirements for Drilling Units[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/96-116, s. 9]Standards For Drilling Equipment[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Meteorological Forecasts[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/96-116, s. 10]Electrical Equipment[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/96-116, s. 11]Small Drilling and Service Rigs[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Diving Operations[Repealed, SOR/2009-315, s. 103][Repealed, SOR/96-116, s. 13][Repealed, SOR/2009-315, s. 103]Blowout Preventer Requirements[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Casing[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Cementation of Casing[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Marine Riser[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Drilling Fluid System[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Air, Foam and Gas DrillingSOR/80-641, s. 21(E)[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Testing Equipment[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Manuals[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Contingency Plans[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Approval to Drill, Approval to Re-enter or Approval to Drill a Test Hole[Repealed, SOR/2009-315, s. 103]Prohibition[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Notification[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Granting, Suspension and Revocation of ApprovalsSOR/96-116, s. 15[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Surface Improvements[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Location of Well[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Well Prognosis[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Evidence of Financial Responsibility[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/96-116, s. 21]Authorized Entry, Inspection and Investigations[Repealed, SOR/2009-315, s. 103]Conservation Officers and Safety Officers[Repealed, SOR/2009-315, s. 103][Repealed, SOR/96-116, s. 22][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Investigation of Accidents[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Drilling of a Well[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Safety Zone[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Availability of Regulations[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Display of Authorizations, Approvals and Critical ProceduresSOR/96-116, s. 25[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Surveys[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Well Control Equipment[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Safety Valves[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Choke Manifold[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Flow Lines from Wells[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Flare Line and Flare Pit[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Protection of Permafrost[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Pressure Tests of Casing and Preventers[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Coal and Mineral Deposits[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Cementation[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Waiting on Cement Time[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Maximum Pressure During Well Stimulation[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Formation Leak-Off Test[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Monitoring of Drilling[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Volume of Drilling Fluid[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Pressure Transition Zone[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Directional and Deviation Surveys[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Plugging Back of Wells[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Drilling Unsafe to Continue[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Inspections and Tests of Equipment[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/96-116, s. 28]Inspection of Electrical Equipment[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/96-116, s. 29]Quantities of Consumables[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Bulk Handling of Fuel and Consumables[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Waste Material[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Radio and Support Craft Procedures[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Moving Drilling Units[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Anchors[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Stability[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/96-116, s. 30]Safety and Training of Personnel[Repealed, SOR/2009-315, s. 103]General[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]General Safety[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Training of Personnel[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Safety Drills[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/96-116, s. 31]Safety Instruction[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Rest Period[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/96-116, s. 32]Smoking[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/96-116, s. 33]Radioactive Substances[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/96-116, s. 34]Operational Records and Reports[Repealed, SOR/2009-315, s. 103]General[Repealed, SOR/2009-315, s. 103]Safety and Well Evaluation Information[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Reference for Well Depths[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Notification of Significant Event[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Notifications to Conservation Engineer[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Submission of Survey Plan[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Tour Sheets and Barge Reports[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Daily Records[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Routine Reports[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Downhole Survey Record[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Penetration and Gas Content Records[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Formation Flow Records[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Report of Structural Faults[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Well Termination Report[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Press Releases[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Well Evaluation[Repealed, SOR/2009-315, s. 103]General[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Drill Cuttings[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Cores[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Gas Content of Drilling Fluid[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Wireline Logs[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2002-170, s. 6][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Testing and Sampling of Formations[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Formation Flow Test[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Well Termination[Repealed, SOR/2009-315, s. 103]Application[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Removal of Casing[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Surface Marking and Restoration[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Drilling Rig Removal Prohibited[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Operator Responsible for Abandoned Wells[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Location of Abandonment Plugs[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Length and Quality of Cement Plugs[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Feeling for Plugs[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Termination of Test Holes[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Marking of Well-heads[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Fluid in Abandoned or Suspended Wells[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Suspended Wells[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Well Completion[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Deposition of Samples from a Well[Repealed, SOR/2009-315, s. 103]General[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Drill Cuttings[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Sidewall Cores[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Conventional Cores[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Analysis of Fluid Samples[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Delivery of Samples and Other Materials to ChiefSOR/96-116, s. 43(F)[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Final Well Reports[Repealed, SOR/2009-315, s. 103]Exploratory and Development Wells[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103]Test Holes[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/96-116, s. 41][Repealed, SOR/2009-315, s. 103]Offences[Repealed, SOR/2009-315, s. 103][Repealed, SOR/2009-315, s. 103][Repealed, SOR/2002-170, s. 9]