Canada Oil and Gas Land Regulations (C.R.C., c. 1518)
Full Document:
Regulations are current to 2013-05-26
SCHEDULE II
(ss. 40, 42 and 80)
DEPOSITS
| Column I | Column II | |
|---|---|---|
| Period | Deposit | |
| 1. | The first 18-month period of the original term in the case of a permit referred to in subsection 36(1), (2), (3) or (5) or paragraph 36(6)(b), | $0.05 for each acre to be included in the permit. |
| 2. | The first 36-month period of the original term in the case of a permit referred to in subsection 36(4) or paragraph 36(6)(a), | $0.05 for each acre to be included in the permit. |
| 3. | The second 18-month period of the original term in the case of a permit referred to in subsection 36(1), | $0.15 for each acre included in the permit. |
| 4. | The 30-month period of the original term next following the first 18-month period of the original term in the case of a permit referred to in subsection 36(2), (3) or (5) or paragraph 36(6)(b), | $0.15 for each acre included in the permit. |
| 5. |
| $0.15 for each acre included in the permit. |
| 6. |
| $0.20 for each acre included in the permit. |
| 7. | The first renewal period of a permit referred to in subsection 36(1) or (2); and the second renewal period of a permit referred to in subsection 36(3) or (4), | $0.30 for each acre included in the permit. |
| 8. |
| $0.40 for each acre included in the permit. |
| 9. | The third renewal period, except for a permit referred to in subsection 36(5) or (6), | $0.50 for each acre included in the permit. |
| 10. | The fourth renewal period, | $0.50 for each acre included in the permit. |
| 11. | The fifth renewal period, | $0.50 for each acre included in the permit. |
| 12. | The sixth renewal period, | $0.50 for each acre included in the permit. |
| 13. | The period of an extension granted pursuant to section 39, | $0.10 for each acre included in the permit. |
- Date modified: